1900 Meridian
Structural retaining wall built against an existing building, in a live parking area. Dowels drilled and set into the existing wall, mat and vertical steel tied to the engineer's detail, formwork braced off the slab, then placed, stripped, and finished in stucco. Concrete cylinders pulled and broken to confirm the mix.